Skip to content

Preparation for the autumn-winter season was reviewed at Gulistan State Pedagogical Institute

0 views
Preparation for the autumn-winter season was reviewed at Gulistan State Pedagogical Institute

A working group led by the Deputy Minister of Higher Education, Science and Innovation of the Republic of Uzbekistan, Salomov Uktam Rahimovich, visited Gulistan State Pedagogical Institute and reviewed the state of preparation for the 2026–2027 autumn-winter season.

During the visit, the institute's boiler houses and heating system were inspected. The coal reserves accumulated for the season, the equipment of the boiler houses with automatic control systems, and the work being carried out regarding compliance with fire safety requirements in the operation of the heating system were examined.

These measures are aimed at ensuring the autumn-winter season passes without incident, maintaining the necessary temperature in the institute's buildings, and ensuring the continuity of the educational process.

Preparation for the autumn-winter season was reviewed at Gulistan State Pedagogical Institute — 2Preparation for the autumn-winter season was reviewed at Gulistan State Pedagogical Institute — 3Preparation for the autumn-winter season was reviewed at Gulistan State Pedagogical Institute — 4Preparation for the autumn-winter season was reviewed at Gulistan State Pedagogical Institute — 5Preparation for the autumn-winter season was reviewed at Gulistan State Pedagogical Institute — 6Preparation for the autumn-winter season was reviewed at Gulistan State Pedagogical Institute — 7Preparation for the autumn-winter season was reviewed at Gulistan State Pedagogical Institute — 8

Related